All alloy shell, anti-corrosion, anti-exposure
Working Pressure | 0-16Bar |
Working Medium | various compressed gases |
Working Temperature | 0-80ºC |
Port Size | 1/2PT |
24 hours automatic drainage |
1. When installing, press the arrow to confirm the direction of the inlet and outlet, and the drain body must be kept in a vertical direction2. If the water volume is particularly large, turn the regulating
Valve counterclockwise to increase the water volume, and tighten the nut after adjustment3. If there is no drainage, turn the regulating valve counterclockwise to let the air pressure flush out the dirt and then tighten the regulating valve.4. If the environment is too dirty, the filter needs to be cleaned regularly. Steps to clean the filter:1) First close the air inlet valve and confirm that there is no pressure inside2) Twist the upper cover, take out the filter screen of the upper cover for cleaning, and lock the upper cover when reinstalling it3) Twist the lower cover, take out the filter screen of the lower cover, clean it, and then put it back in sequence5. The drain port is connected to the outer diameter 8 to guide the sewage pipe, or the drain port connector can be removed and the 1/2 pipe can be used to enter the sewage system
Contact us if you need more details on Pneumatic Automatic Drain. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Pneumatic Drain、Drain. If these products fail to match your need, please contact us and we would like to provide relevant information.
Product Categories : Machinery Parts > Auto Parts